To projects
Center-East. Western bypass of Pavlodar
About the project

Location - the Republic of Kazakhstan, Pavlodar Oblast
The length – 27.4 km
Coverage– Asphaltic concrete
Category – I-B, II
Contract cost - $ 65 million
Main types of work - Reconstruction of the road and construction of
overpasses and traffic interchanges

BI Road Construction is actively involved in the development of a modern road network that meets the necessary standards of quality and durability. In 2015, the Avtodor NS road division reconstructed the Western bypass of Pavlodar, within the Center-East corridor.

The Western bypass was divided into three sections:

- road Kyzylorda-Karaganda-Ekibastuz-Pavlodar 1367-1380 km;
- road Leninsky-Aksu-Koktobe-Bolshoy Akzhar-Kurchatov 0-11km;
- transport interchange with access to the bridge crossing across the Irtysh river.

Section 1 belongs to the I-B category and has four lanes and a dividing strip. Section 2 belongs to the II category and has two lanes. In addition, section 1 has a multi-level interchange of the full cloverleaf type; section 2 is pipe typed; and section 3 has an overpass through an electrified railway.

  • NC KazAutoZhol JSC

    Customer

  • 2015

    Implementation date